Official Report for Saturday October 1, 2016

This forum is dedicated to the preservation of the WWII submarine USS Torsk in Baltimore, MD

Moderators: Gilbert, Bruce

Official Report for Saturday October 1, 2016

Postby TVA » Mon Oct 03, 2016 4:25 pm

Official Work Summary
Saturday, October 1, 2016


Crewmembers on board: Chief Mike, Dave, Larry “Ski,” Frank, Jaime and Tracey.

It was almost like a Saturday Field Day at sea…

Maintenance:
• Dave started deep cleaning in the Conning Tower in preparation for restoration work. He vacuumed and de-greased the floor and surfaces. The floor’s padding will require more work.
• Chief Mike re-lamped the boat as much as was possible as the supply of fluorescent bulbs would permit.
• Chief Mike and Tracey polished brightwork on the boat. Tracey polished the brightwork on the rudder hydraulic pump motor [photo] in the After Torpedo Room and Control and silverware in the Wardroom. She also worked on brightwork on the bridge. Chief Mike polished in

Image

Maneuvering and engine rooms.
• Tracey vacuumed debris from the Conning Tower ladder water way.
• Ski repaired security hardware in Forward Battery.

Restoration:
• Rob and Tracey discussed painting plans for the Forward Torpedo Room.

Facts of note: The Belfort Barometer barometric pressure in the Conning Tower was 30.1 inches.

Hours for the week: 27.
Hours for the year: 751.